Client: Neptune Oil & Marine Services
Location: West Africa Offshore Mooring Field
Duration: 3 weeks (September 2024)
Scope of Work:
Fabricate and install a permanent mooring system including subsea anchor piles and cross bracing for a floating production storage and offloading (FPSO) unit.
Execution:
Divers conducted seabed prep using high-pressure jetting tools.
Welded 8 anchor piles (each 12m in length) to cross-brace frames using hyperbaric welding techniques.
Conducted real-time remote NDT via ROV to ensure weld precision.
Used AWS D3.6M-certified procedures to meet international standards.
Outcome:
Mooring system passed Bureau Veritas inspection and was fully operational within timeline. Client reported increased vessel stability and load capacity.